REINFORCED SOIL SYSTEM

MODULAR RETAINING WALL

Modular facing units, interlocked geogrid, compacted fill and drainage work as one structure.

Modular concrete block retaining wall running alongside a road.SYSTEM RENDER · NOT A PROJECT PHOTO
SYSTEM BUILD-UP

TYPICAL SECTION · MODULAR REINFORCED SOIL WALL

Retaining wall of precast modular units with geogrid cast into the unit, backed by a reinforced soil mass.

01

PRECAST MODULAR FACING

face batter 1 : 0.05

02

PRIMARY REINFORCEMENT

L = 4.0 m · spacing 0.5 m

03

2 LAYERS HG-T GEOGRID

full width under pavement

04

DRAINAGE LAYER

500 mm crushed stone

05

STONE CUSHION

0.6 m · 2 HG-T layers

HLG-F-03 · TYPICAL SECTION · MODULAR REINFORCED SOIL WALL FOUNDATION BEARING CAPACITY ≥ 180 kPa AXIS H = 9.0 m ≥ 1.0 m 4.0 m A PAVEMENT STRUCTURE crossfall 2.0 % 2 LAYERS HG-T GEOGRID full width under pavement EMBANKMENT SLOPE 1 : 1.50 PRECAST MODULAR FACING face batter 1 : 0.05 PRIMARY REINFORCEMENT L = 4.0 m · spacing 0.5 m SECONDARY REINFORCEMENT L = 2.0 m DRAINAGE LAYER 500 mm crushed stone STONE CUSHION 0.6 m · 2 HG-T layers A · MODULE-TO-GEOGRID CONNECTION 66 cm 25 cm CAST-IN-PLACE CAP BEAM GEOGRID PRE-EMBEDDED in the module CONNECTOR BAR C30 MODULE 66 × 25 cm STRIP FOOTING C30 concrete Type B modules carry the pre-embedded geogrid; type A do not. TYPICAL SECTION · MODULAR REINFORCED SOIL WALLHalf of a symmetrical section · wall height H = 9.0 m · chainage and borehole numbers removedHLG · F-03 LEGEND Primary reinforcement Secondary reinforcement Reinforced fill Crushed stone · drainage and cushion Foundation soil C30 concrete Section redrawn from the construction drawing of a completed project; chainage, borehole numbers and third-party product designations removed. Wall height, reinforcement length and spacing, drainage detailing and foundation requirements are determined by project-specific design.

◀ drawing is wider than the screen · scroll ▶

HLG-F-03 · TYPICAL SECTION · MODULAR REINFORCED SOIL WALL MODULAR REINFORCED SOIL WALL · H = 9.0 m HLG · F-03 FOUNDATION BEARING CAPACITY ≥ 180 kPa AXIS H = 9.0 m ≥ 1.0 m 4.0 m A 1 2 3 4 5 1 PRECAST MODULAR FACING face batter 1 : 0.05 2 PRIMARY REINFORCEMENT L = 4.0 m · spacing 0.5 m 3 2 LAYERS HG-T GEOGRID full width under pavement 4 DRAINAGE LAYER 500 mm crushed stone 5 STONE CUSHION 0.6 m · 2 HG-T layers DETAIL A — SEE SHEET HLG · F-03a Redrawn from the project construction drawing; chainage, borehole numbers and third-party designations removed.
HLG-F-03a · A · MODULE-TO-GEOGRID CONNECTION MODULE-TO-GEOGRID CONNECTION DETAIL HLG · F-03a 66 cm 25 cm 1 2 3 4 5 1 CAST-IN-PLACE CAP BEAM 2 GEOGRID PRE-EMBEDDED in the module 3 CONNECTOR BAR 4 C30 MODULE 66 × 25 cm 5 STRIP FOOTING C30 concrete Type B modules carry the pre-embedded geogrid; type A do not. Module and connection dimensions are set by project design.
HLG · F-03Half of a symmetrical section · wall height H = 9.0 m · chainage and borehole numbers removed

SYSTEM CAPABILITY

What the system can do and what one completed object did are different quantities, so they stay in separate columns.

PARAMETERSYSTEM CAPABILITYCOMPLETED PROJECT
DESIGN FLEXIBILITYUP TO 1V:0.02Hfacing batter1 : 0.05
WALL HEIGHTby designset by loads, geometry and soil characteristicsH = 9.0 membedment ≥ 1.0 m
REINFORCEMENTHG-U geogridcast into the facing unitL = 4.0 m0.5 m spacing

Maximum wall batter (vertical to horizontal) is site specific and subject to design conditions including loads, geometry, soil characteristics, reinforcement selection, and governing codes. Engineering evaluation required.

Wall height, reinforcement length and spacing, drainage detailing and foundation requirements are determined by project-specific design.

Completed modular block retaining wall on a client project, running alongside a grassed embankment.
CLIENT PROJECT

SEND YOUR PROJECT DATA

Send your project data for a preliminary engineering assessment.

DISCUSS YOUR PROJECT